Forms
The temporary acceptance of the 125 MVA 400/36 kV Transformer Center and the revival of the energies have been successfully completed.
High Speed Train Project Manufacturing
İSKEN Sugözü Thermal Power Plant 400/33.6 kv 125 MVA Bank Feeder, GES Transformer center switchgear installation